Notes
Engineering notes from the audio pipeline team.
Loudness that survives re-encoding
2026-10-22 · Why we measure EBU R128 integrated loudness after the last lossy step, not before.
Moving 240 TB of takes to the v3 bucket layout
2026-10-21 · Checksummed manifests, a two-week dual-read window, and what broke at 3am.
All releases
Every version, newest first.